The first job was setting out and boxing up and ensuring it was all square and level.
Next we had to spread two truck loads of fine crushed rock and level it off.
The next stage was the steelwork.
Then three truck loads of readymix from St Helens.
Next colour was added to the surface.
Then the surface was stamped with a bush rock pattern.
This shows the pattern before the final stain is applied.
After staining to bring out the highlights the surface is sealed with a clear sealer.
THE FINISHED SLAB LOOKS GREAT, NEXT STEP IS FRAMING UP.








