Pouring the slab . . .

1 Boxing Up

The first job was setting out and boxing up and ensuring it was all square and level.

2 FCR

Next we had to spread two truck loads of fine crushed rock and level it off.

3 Steelwork

The next stage was the steelwork.

4 The Pour

Then three truck loads of readymix from St Helens.

5 Colour

Next colour was added to the surface.

6 Stamping

Then the surface was stamped with a bush rock pattern.

7 Stamped

This shows the pattern before the final stain is applied.

8 Stain and Seal

After staining to bring out the highlights the surface is sealed with a clear sealer.

9 Finished Slab

THE FINISHED SLAB LOOKS GREAT, NEXT STEP IS FRAMING UP.